Changing a Cistern to Drinking-Water Use: Review More Than the Lining

Before converting a nonpotable cistern, review its history, source, connected plumbing, lining approval and commissioning responsibilities.

Conceptual cistern model with a separate roof-catchment model, water droplet and inspection document.

A cistern used for irrigation is being considered for a household water supply. The first request may be for a drinking-water-contact lining, but the decision is larger than the coating. The proposed change affects the source, previous tank contents, plumbing, treatment, operation and the people who will rely on the water.

Keep the proposed drinking-water service on hold while those questions are reviewed. A new lining, clear-looking water or one laboratory result should not be treated as permission to connect the tank to drinking-water outlets.

Write down the old use and the proposed new use

Create a short before-and-after description. What has the tank held? Where does the water come from now? Which outlets will it serve after the change? Does it share pumps or piping with irrigation, process water or another supply?

Find original tank information, previous lining records, cleaning history and known contamination events. Record gaps honestly. A tank with uncertain contents or an unsuitable construction history may not be a candidate for conversion. Ask the responsible water-system professional to evaluate suitability before paying for a coating specification. Do not assume that covering an old surface resolves its history.

Include the proposed users and demand pattern. A seasonal property, a commercial premises and a continuously occupied home present different operating questions. For the latter stages of review, our low-demand cistern guide explains why water age deserves attention alongside the lining.

Identify the authority and the technical reviewer early

Contact the local health or drinking-water authority and the relevant plumbing authority before ordering the work. Explain the actual source and intended use rather than asking only whether a particular coating is approved. Establish who must review the conversion, what documentation is needed, and who can authorize the finished supply for use.

For rainwater systems, CDC advises consulting the health department about testing, treatment and safe use. It also cautions that collected rainwater can contain germs or chemicals even when it looks clean. These concerns begin before water reaches the cistern and cannot be answered by the lining contractor alone.

Review the whole water-contact path

Make a system sketch for the reviewer. Include the collection or supply point, storage, treatment equipment, pumps, distribution piping and intended outlets. Mark other water connections and any temporary arrangements proposed for the work. Use verified information; let the qualified reviewer resolve hidden or uncertain piping.

EPA’s cross-connection and backflow resources explain how a connection between nonpotable and potable systems can allow contamination to enter the drinking-water system. A coating does not correct that pathway. Have the required separation and backflow protection designed and verified by the appropriate professionals; do not improvise a hose connection to try the converted tank.

For roof-collected water, review the collection materials as well. NSF’s rainwater collection guidance distinguishes evaluation of catchment components from evaluation of storage and distribution components. A suitable tank lining does not establish the suitability of a roof coating, gutter or upstream material.

Define what the lining approval must establish

Obtain the exact product and system identity, including any primer or repair material that will contact water. Ask for the current certifier listing and the use limitations applicable to the proposed installation. Resolve questions with the manufacturer and certifier rather than relying on a generic material description.

NSF/ANSI/CAN 61 addresses health effects from contaminants imparted by water-system materials. It does not certify that an entire existing cistern system treats its source water or meets every requirement for a new drinking-water service. Our certification explainer provides a separate reference for checking the product claim.

Ask the technical parties to decide what existing material must be removed, whether repairs are feasible, and how the complete installation will be accepted. Do not specify an overlay simply to avoid investigating the old lining.

Agree on commissioning and ongoing operation

Before the outage, assign responsibility for the approved cleaning and commissioning procedure, any treatment work, sampling, laboratory review and final release. The schedule needs to accommodate unresolved results or corrective work instead of assuming that installation completion is the drinking-water start date.

Our water-testing planning guide covers laboratory coordination. The appropriate testing scope and interpretation should come from the responsible authority or qualified water professional, based on the system and its history. This article does not prescribe a universal sampling panel or disinfection recipe.

Leave the operator a written plan identifying the approved uses, treatment and maintenance responsibilities, monitoring requirements and what to do when a result or operating condition is unacceptable. Include the responsible contacts and the records that supported release.

A successful review may conclude that the existing tank should remain nonpotable, or that a separate drinking-water supply is preferable. Establishing that boundary before relining avoids spending money on a surface upgrade that cannot deliver the intended water service.

To organize the information before an assessment, use our cistern relining project brief. It keeps known facts, missing records and proposed uses in one place.

Do this work for a living

Want to spray cistern liners?

ArmorThane equips and trains contractors to line cisterns, tanks and pipe with polyurea. Get the startup details in two minutes.

Keep reading

Related articles

All articles

Get started

Ready to spray cistern coatings?

Tell us a little about you. A coatings specialist will follow up with equipment options, training dates and pricing, or connect you with a trained applicator if you need a tank lined.

  • Takes about two minutes
  • A real person follows up, not an autoresponder
  • Equipment, training, materials and financing in one conversation

Backed by ArmorThane. Polyurea and polyurethane coatings manufacturer since 1989, Springfield, Missouri.

Step 1 of 2

What brings you here?
Where should we send the details?
I’m interested in

A coatings specialist from ArmorThane will contact you. No spam, ever. See our privacy policy.